Feb 23, 2020
Spar
- (4 hours)
Category: Fuselage
Did 6layer layup of Triax on each side of the cabin at the spar as part of the torsion box reinforcement. Removed the molded main gear sleeves from each gear and removed the aluminum foil from the gear legs.